Wednesday, June 8, 2011

A day Building...Playing with fire and water

Today the team concentrated on a number of projects at the building site. All of the windows are now installed, 90% of the trim is complete, the interior paint is now complete, except for some touch up in places. Daryl and Kyle started on plumbing today, as well as a sidewalk from the hillside steps to the front entry. The French drain is now finished. The team anticipates starting on the rain gutters next, pouring concrete for the sidewalk, and continuing with the plumbing.
Thanks for praying!
Daryl heating plastic pipe to fit over bushing,
not exactly the way we might do it at home, but sometimes a little fire,
and a sharpened stick for an expanding reamer gets the job done.

The team ran plastic pipe for the 130’ run down the hill
from the water main to the shut off near the bathroom,
then around to the front of the building to the kitchen area.

Kyle drilling through the concrete wall to install water lines to the kitchen sink.

Just a note to all who have a smart phone or Ipod, Ipad, Iphone,  and Ianythingelse.  I turned on a mobile format now.  This can be view nicely on mobile devices now. Still browse to balangao.blogspot.com.  Let me know if it is OK or not.

Brad

No comments:

Post a Comment