Tuesday, June 7, 2011

A day Building...Paint and doors A test run for the Helicopter

Today the team focused on painting, window trim, installing louvered windows, preparations for the gutter installation, installing the French drain behind the building, and running the water supply line from the main behind the church. Things are going well, and everyone is really focused on finishing at this point in the project. We want to thank all of you for lifting us up in prayer. The heat is overwhelming at times, sometimes a shower at noon and a change of clothes help get us through the rest of the day. Our Balangao team mates are sure a great bunch of guys, their help, and teamwork has been a tremendous blessing as we labor together.
Thanks for the prayers!
The Balangao Team
Preparing to hang interior doors.

New Tribes Helicopter came for a helipad check out today.
 (Translation office in background)

Finished paint, trim, and window.